Smart meter installation has commenced in Division I, Panjim (Taleigao, Bambolim, Corlim and Panjim City). Authorized representatives will visit your premise for meter replacement. Smart Meter installation is free of cost for all consumers. For any installation concerns, contact the nearest GED office or Call Helpline 1912.    •    Fraudulent messages regarding power disconnection are being circulated. Do not click on any links or share personal detailsSmart meter installation has commenced in Division I, Panjim (Taleigao, Bambolim, Corlim and Panjim City). Authorized representatives will visit your premise for meter replacement. Smart Meter installation is free of cost for all consumers. For any installation concerns, contact the nearest GED office or Call Helpline 1912.    •    Fraudulent messages regarding power disconnection are being circulated. Do not click on any links or share personal details

भारत ने हासिल किया 50% गैर-जीवाश्म ऊर्जा क्षमता का लक्ष्य

03-Apr-2026

भारत ने हासिल किया 50% गैर-जीवाश्म ऊर्जा क्षमता का लक्ष्य

  • निर्धारित समय सीमा से 5 वर्ष पहले मिली ऐतिहासिक सफलता
  • कुल स्थापित विद्युत क्षमता: 484.8 गीगावाट (GW)
  • गैर-जीवाश्म ईंधन आधारित क्षमता: 242.8 गीगावाट (GW)
  • भारत की ऊर्जा क्रांति: 50% गैर-जीवाश्म क्षमता के साथ NDC लक्ष्य हासिल